Carrington Battery Energy Storage System For Statera Energy.

carrington

Overview

Location

Manchester

Value

£13.5m

Status

Ongoing

Client

statera

The Challenge..

The Carrington Battery Energy Storage project required the transformation of a complex brownfield site, formerly associated with Manchester’s Carrington Power Station, into a stable and fully prepared development platform capable of supporting a 680 MW / 1360 MWh energy storage facility.

Our Solution..

ACS was appointed by Statera Energy as Principal Contractor to deliver a significant enabling works package. This landmark project forms a key part of the UK’s transition toward resilient, low-carbon energy infrastructure.

ACS’s scope of works is structured around two primary packages.

Package 1 – Early Works

  • Establishment of site access
  • Construction of temporary haul roads
  • Installation of a culvert crossing
  • Creation of the main construction compound
  • Welfare and office foundations
  • Installation of site utilities
  • Initial identification and management of invasive species

Package 2 – Development Platform

  • Major earthworks across the brownfield site
  • Slope stabilisation works
  • Installation of retention structures
  • Site-wide drainage installation
  • Capping works across the development platform

The Result..

Works commenced in early September 2025, with site establishment and a substantial
remediation and earthworks programme now underway to prepare the former Carrington
Power Station site for the next phase of construction.

carrington

Statera Energy is an ideal partner for ACS, innovative, forward-thinking, and committed to delivering projects that will strengthen the resilience of the national grid. We’re excited to be working collaboratively to bring this strategically important energy storage facility to life.