Biggleswade 400kV Substation | Omexom

The Challenge.
In Q1 of 2023, we were appointed by Omexom UK as the principal civils contractor for the construction of a new 400kV substation in Biggleswade, a critical infrastructure project delivered on behalf of National Grid.
This new substation forms part of a £40 million investment into the East Anglian energy network, enhancing power capacity and enabling future housing and business developments in the area.
Project Objectives
- Deliver enabling civil infrastructure for a new 400/132kV substation
- Support the installation of two 178-tonne Supergrid Transformers (SGTs)
- Ensure full compliance with NGTS (National Grid Technical Specifications)
- Enable timely progress to key outage and commissioning dates
The Solution.
Our team carried out a wide range of complex and critical civil engineering activities, including:
Foundations & Structural Works
- Installation of 1300m³ of concrete and steel reinforcement cages
- Construction of reinforced concrete slabs for water tanks, battery rooms, LVAC rooms, and communications rooms
- Formation of amenities foundation bases
- Grouting of 145 precast columns
Mechanical & Utilities Installation
- Installation of a new high-pressure water main
- Installation of underground oil draw-off and carrier pipes
Surface & Finishing Works
- Placement of 3000 tonnes of chippings across site roads and yards
- Application of 140 tonnes of construction screed for the SGT bunds
- Preparation of 150,000m² of ground for aggregation and seeding
- Installation of 18 lighting column bases, ducting, and earthing
Key Milestones
- February 2024: Successfully delivered and placed the two Supergrid Transformers (SGTs) onto newly completed bunds
- Navigated one of the wettest Februarys on record, maintaining programme integrity and safety
- Enabled Omexom UK to progress with steel erection, busbar installations, and auxiliary works
Project Highlights
- Strong collaboration with Omexom UK, with whom we have delivered multiple projects across the UK
- High compliance with National Grid’s technical standards and safety protocols
- Delivery under challenging weather conditions and tight milestones
- Enabling key infrastructure to support the long-term growth of Biggleswade and surrounding regions
The Result
The Biggleswade 400kV substation project demonstrates our capacity to deliver high-specification civil infrastructure under tight timeframes and in challenging environments.
As energy infrastructure continues to evolve, we are proud to play a role in strengthening the UK’s power network for the future.