ACS Construction Group Limited have carried out the installation of sewer drainage to be adopted by Severn Trent Water for the redevelopment of Longbridge Town Centre.
The works have involved the installation of over 1,160m of drainage and 38Nr manholes at depths of up to 5.5m. Over half of this drainage was 900mm diameter concrete pipes for a Surface Water Sewer.
A significant portion of this work was carried out in a live carriageway environment, in a very busy location, adjacent to the entrance to the development. This work therefore involved a significant interface with the general public in terms of both pedestrian and traffic management.
These works, carried out over a three month period, were completed on time, to a high quality, and with minimum disruption to all third parties.
We would happily work with ACS Construction on any works of a similar nature, and have no hesitation in recommending them to other potential clients who require large and complex drainage installations.
-